Manufacturing Process

Crusher Wear Parts Manufacturing Process — 9 Controlled Steps

From raw material to finished casting in nine documented steps. For each step this page sets out what actually happens, why that step is controlled, and what quality record it produces — so you can see where the properties of your wear parts are decided.

Our Process

9 Steps from Order to Delivery

Each step has a defined duration, a reason it is controlled, and an inspection point. Where a step matters more for your application, we will tell you which one and why.

01
🖌

Կաղապար & Կաղապարի դիզայն

7 – 15 օրեր

Our pattern shop produces wooden or resin patterns from your drawing, OEM sample or part number. Moulds are designed with the correct shrinkage allowance, draft angle and feeding system for the part.

Why it matters: Shrinkage allowance and feeding design decide whether a casting comes out dimensionally correct and internally sound. A pattern that is right for one alloy is often wrong for another, so the pattern is matched to the material being poured.

Quality control: Dimensional check and 3D verification of the pattern before release to production.

02
📊

Հումքի ստուգում

1 – 2 օրեր

Incoming steel scrap, pig iron and ferro-alloys are inspected for chemistry and cleanliness. Approved material is released to the melting shop with an internal batch number.

Why it matters: No heat treatment or machining step can correct bad chemistry. Contaminated or mis-sorted scrap is the single most common cause of an out-of-spec manganese heat, so material is verified before it reaches the furnace.

Quality control: Spectrometer analysis of incoming alloy material; visual cleanliness check on scrap.

03
⚀

Հալվելը & Զտում

1 – 2 օրեր

Melting is carried out in medium-frequency induction furnaces sized from 1.25 t to 5 t depending on casting weight and batch size. Final chemistry and temperature are adjusted in the ladle.

Why it matters: Carbon and manganese content determine whether the austenitic structure will be stable after heat treatment. Pouring temperature decides how well the mould fills and how much shrinkage porosity ends up in the finished part.

Quality control: A spectrometer sample is taken from every heat and the result recorded before pouring is authorised.

04
🔨

Կաղապարում & Հիմնական պատրաստում

1 – 2 օրեր

Moulds are produced by lost-foam (EPC), V-process vacuum moulding or sand casting depending on the part geometry and quantity required. Cores for internal cavities are made and assembled.

Why it matters: Mould hardness, coating and core positioning control surface finish, dimensional accuracy and which defects a casting will tend to develop. The process route is selected per part rather than applied uniformly.

Quality control: Visual and dimensional inspection of the assembled mould, plus core position check, before pouring.

05
💦

Հորդառատ

Same day

Molten steel is poured into the moulds at a controlled temperature and pouring rate. Risers and gating systems feed the casting as it solidifies.

Why it matters: Pouring too cold produces misruns and cold shuts; pouring too fast erodes the mould. Feeding design determines whether the last section to solidify receives liquid metal or ends up with shrinkage voids.

Quality control: Pouring temperature and time are logged for every casting, and traceable to the heat number.

06
❄

Սառեցում & Թափահարում

1 – 3 օրեր

Castings cool in the mould for the prescribed time, then the moulding sand is removed. Risers and gating systems are cut off and the raw casting is cleaned.

Why it matters: Cooling too quickly in the mould creates internal stress that can cause cracking during heat treatment or in service. The cooling time is set by section thickness rather than by production convenience.

Quality control: Visual inspection of the raw casting for surface defects; section thickness check on critical areas.

07
🔥

Ջերմային բուժում

2 – 4 օրեր

Solution treatment and water toughening for manganese steel; quenching and tempering for high chrome alloy and alloy steel. Furnace size is matched to the casting so that it heats evenly.

Why it matters: This is the step that creates the material properties. For high manganese steel it dissolves carbides back into the austenite so the part work-hardens in service instead of failing early; for high chrome iron it develops the martensitic matrix and carbide structure that give the hardness.

Quality control: Furnace records are kept per batch, and hardness is tested after heat treatment before the part moves to machining.

08
⚙

հաստոցներ & Հարդարում

3 – 10 օրեր

Castings are brought to OEM dimensions by CNC and conventional machining, including turning, milling, drilling and tapping. Large vertical lathes and hydraulic straightening presses handle oversize parts and distortion correction.

Why it matters: Wear parts are fitted onto existing crushers and mills, so mounting faces, bolt holes and locating shoulders have to match the original geometry. Dimensional error here shows up as premature bolt failure or uneven wear in service.

Quality control: Dimensional inspection against the customer drawing, using calibrated gauges and templates for every critical dimension.

09
📦

Վերջնական ստուգում & Փաթեթավորում

1 – 3 օրեր

Final inspection is completed and the documentation package is compiled. Parts are packed in steel-framed wooden cases lined with waterproof film, with shipping marks per customer requirements.

Why it matters: The documentation package is what allows a plant to accept the parts into stores and to trace them later. Packing determines whether heavy castings arrive undamaged — and whether the mounting surfaces still meet tolerance after a long ocean voyage.

Quality control: Final inspection before packing, with a photo record and a complete document set for the shipment.

Typical Lead Times

How Long Does It Take?

Lead time depends on part size, material and quantity. Below are typical ranges for our standard products.

Standard OEM Parts

30-45 օրեր

Թիկնոցներ, գոգավոր, jaw plates and other standard parts with existing patterns.

Պատվերով ձուլվածքներ

45-60 օրեր

New patterns or complex custom parts requiring new tooling.

Repeat Orders

25-35 օրեր

Repeat orders with existing patterns and proven material recipes.

Urgent / Stock Items

7-15 օրեր

Selected stock parts available for immediate shipment on request.

Packaging & Shipping

How We Ship Heavy Castings Worldwide

Proper packing and documentation are critical. We handle everything so you receive your castings in perfect condition.

📦

Seaworthy Wooden Cases

Plywood cases with steel frame reinforcement, lined with waterproof film and foam. Suitable for ocean shipping in 20ft/40ft containers.

🚚

Bulk / Break-Bulk

For large or heavy castings shipped by break-bulk vessel. Wooden skids with steel strapping and weather protection.

📄

Export Documentation

Commercial invoice, packing list, certificate of origin, material certificate and inspection report — all prepared by our logistics team.

🌐

Worldwide Shipping

We ship to 60+ countries via Ningbo / Shanghai port. FOB, CIF and DAP terms available based on your preference.

Ստացեք մեջբերում

Send Your Drawing or OEM Part Number

We will respond with material grade, weight, price, lead time and shipping cost within 12 ժամեր, with our ISO 9001 inspection and documentation scope confirmed for your order.